Case Studies
Van der Valk Hotel Gorinchem partnered with us to tackle limescale issues, ensuring sustainability
NEO KVL Hotel installed Sidon Integro to remove limescale, improve efficiency, and reduce costs.
The Thomas Lord Pub faced severe limescale issues. Installing two Integro™ units effectively removed
This company’s hard water issues led to significant scale build-up. Installing the Integro™ system
The company dealt with scale build-up in condensers and ice machines, reducing ice production
Hard water impacted equipment performance and fabric quality. Installing the Integro™ on the cold
This apartment hotel in London faced severe limescale problems affecting their water systems and
Located in Scotland, these holiday lodges faced significant limescale build-up from borehole water. Installing
WB Chambers Farms faced significant scale build-up in their irrigation system, resulting in frequent
This luxury hotel in Barcelona faced significant limescale issues affecting its water systems and
A luxury hotel in Barcelona struggled with high costs and incomplete solutions from a