The Marriott Swindon is a 156 bedroom hotel located in an area with particularly hard water.
The hotel has historically experienced significant hard water problems throughout the hot and cold systems and other critical water related equipment.
A total of four lntegro™ units were installed. Two on the cold water supply, taking care of the entire building and two directly before the boilers and heat exchangers, to protect the hot water system and valuable equipment.
“Sidon Water have been easy to work with every step of the way resulting in an extremely successful project.”
Stay updated with our latest news, offers and promotions.