Case Study

David Lloyd Ringwood

IMG-20251015-WA0014

Industry: Gyms & Leisure

Location: David Lloyd Ringwood, Hampshire

Programme Phase: Programme Phase:

Installation Type: Cold water primary & hot water return

Background

David Lloyd Ringwood operates with significant hot water demand across showers, kitchen facilities, and general domestic services. A legacy water softener was found to be faulty and bypassed, leaving the site effectively untreated and exposed to ongoing limescale issues.

Challenge

  • Scaling and leakage evident on hot water return pipework
  • Showerhead scaling causing frequent maintenance issues
  • Imbalanced hot water cylinders and boilers
  • Suspected failure of hot water recirculation components
  • Increased Legionella risk due to temperature imbalance

Our Solution

Integro™ Solution

A dual-point Integro™ strategy was proposed:

  • Integro™ unit on the cold water primary to mitigate limescale across the site
  • Integro™ unit on the hot water return to protect cylinders and downstream assets

This approach allows continuous treatment without reliance on salt-based softening systems.

Monitoring & Verification

  • Baseline documentation of calorifiers, pipework, and fittings
  • Monitoring of cylinder temperatures and system balance
  • Showerhead condition checks over a 60–90 day review period

Outcome (Early Stage)

David Lloyd Ringwood presents multiple measurable performance indicators, including system temperature balance, asset condition, and maintenance reduction. The site demonstrates how Integro™ can support both scale control and broader system reliability within complex plant environments.